Access the Full Project by Clicking here!
Bidjugde
JOB
South Mission Beach Lifeguard Station
BID DATE
11/20/14 - 2:00
AGENCY
San Diego
ESTIMATE
$3,717,000
SCOPE
This project involves the demolition of the existing South Mission Beach Lifeguard Station and the construction of a new approximate 3,676 SF Lifeguard Station (partial three-levels) and related site work. Additional work in the adjacent existing parking lot will involve trenching and connection in the street for a new water line. Miscellaneous sidewalk and curb repair and restriping of accessible parking spaces and signage is included. The existing station shall remain in place and be useable until the new station is completed and approved for occupancy. After the new station is in use and outside any defined summer moratorium dates that may exclude work, the old station can be demolished and the site repaired to its original condition/cleared of debris and rip rap per Coastal Conditions of Approval. Jihad Sleiman City of San Diego Engineering and Capital Projects 600 Suite 500 MS 908 San Diego, CA 92101 Tel:(619) 533-7532 Fax:(619) 533-5476 jsleiman@sandiego.gov

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT