Mesilla Water SYS Booster Pump RPLC
BID DATE
12/13/22 - 2:00
AGENCY
Mesilla
ESTIMATE
n/a
SCOPE
The Project includes the following Work: 1. Boosters station to replace and existing station. The work includes: a. Tie into existing 12” water line that will supply the booster station. b. Install a 4” water line from the 12” lint to the booster station. c. Install booster station pumps, piping, valves pressure tank, gas powered electric generator and propane tank. d. Construct associated electrical systems and instrumentation systems e. Construct 4” line out of booster station to connect to existing water system f. Demolish existing booster station lpena@molzencorbin.com