Access the Full Project by Clicking here!
Bidjugde
JOB
Elena Street Slope Repair Utilities Replacement
BID DATE
12/15/22 - 2:00
AGENCY
Morro Bay
ESTIMATE
$300,000
SCOPE
The work shall include, but is not limited to, providing all tools, materials, labor, equipment, and incidentals necessary for the excavation, removal and replacement of an 18” diameter storm drain pipe and a 6” vitrified clay pipe sewer line and all connections, inlets, backfill, and pavement restoration. In addition, the area will be stabilized by the construction of a reinforced concrete, cast-in-place gravity retaining wall with additional placed drainage media and backfill. All utilities not replaced will be protected in place including manholes and returned to their prior condition. The work will also include any required traffic control, signage, public notifications, stormwater control, bypass pumping, shoring, formwork, and all other work necessary to render the infrastructure/facility complete and operational, as shown on the Project Plans and Specifications, as specified herein, and in accordance with City of Morro Bay Standard Specifications and Drawings, Caltrans Standard Specifications, and Greenbook with whichever is more restrictive applying if a conflict arises. eriddiough@morrobayca.gov http://www.morrobayca.gov/Bids.aspx?BidID=106
PREBID
12/7/2022 2:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT