GEON to Red Bluff Water Line Interconnect
BID DATE
12/6/22 - 2:00
AGENCY
ESTIMATE
$275,000
SCOPE
This project will extend a new 8-inch water line from the City of Seabrook’s existing 8-inch water line at the Northeast corner of SH 146 and Red Bluff to the North along the SH 146 Southbound Frontage Road approximately 1,400 linear feet to the City of Pasadena’s 8-inch water line that terminates in front of GEON Performance Solutions. Installation of a meter vault will be included to provide usage data to both cities. All the proposed infrastructure improvements will be located in the TxDOT Right-of-Way of SH 146. https://www.civcastusa.com/project/63641bb4e933372617604026/summary
PREBID
11/29/2022 2:00