Access the Full Project by Clicking here!
Bidjugde
JOB
Replacement of Embarcadero Bridge over Lake Merritt Channel (REBID)
BID DATE
11/6/14 - 2:00
AGENCY
Oakland
ESTIMATE
$18,006,508
SCOPE
The proposed work consists, in general, of the bridge replacement. Said work consists of, but is not limited to, bridge removal, structural excavation and backfill, grading, structural concrete, furnishing and driving cast-in-drilled hole concrete piles, reinforcement steel and miscellaneous metal work, new restroom building, environmental protection, traffic control and other work specifically shown on the plans or included in the specifications and these special provisions. NOTE: MANDATORY PRE-BID Meeting: Prime contractors must attend one or the other of the following MANDATORY meetings:  Monday, October 6, 2014 at 3:30 p.m., in Broadway Conference Room, 4th Floor, 250 Frank H. Ogawa Plaza, Oakland, CA 94612 – OR-  Thursday, October 9, 2014 at 2:30 p.m., in Broadway Conference Room, 4th Floor, 250 Frank H. Ogawa Plaza, Oakland, CA 94612 A mandatory pre-project meeting is scheduled for Oct 6, 2014 - 3:30 pm Nader Rabahat at 510-238-6605, nrabahat@oaklandnet.com

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT