Access the Full Project by Clicking here!
Bidjugde
JOB
Drainage System Improvements SBWR Pump Stations 8 11 Zone 3 Reservoir
BID DATE
12/1/22 - 3:00
AGENCY
San Jose
ESTIMATE
$110,000
SCOPE
The Project generally involves installation of 8” corrugated perforated pipes and one (1) catch basin, and existing concrete ditch modifications at Pump Station 8 & 11, and installation of 4” Trench Drain System and installation of 4” DIP pipe that is connected to the Trench Drain System and the existing drain inlet at Zone 3 Reservoir. https://portal.biddingo.com/landingpage/sanjose/bid/1/41205949/37771628/verification
PREBID
11/16/2022 9:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT