Access the Full Project by Clicking here!
Bidjugde
JOB
Sam Collins Park Phase 1A
BID DATE
12/1/22 - 11:00
AGENCY
The Sabine River Authority of Texas
ESTIMATE
n/a
SCOPE
This project shall consist of all work, complete and in place including but not limited to: Site Preparation and Tree Protection, Demolition, Grading, Temporary Erosion Control, Vehicular Asphalt Paving, Parking Lot Striping, Marine Construction of Floating Docks and Concrete Boat Ramp, Pedestrian (Trail/Sidewalk) Concrete Paving and Aggregate Trail Building, Site Furnishings, Masonry, Utilities, Concrete Retaining Walls, Pre-fabricated Restrooms, Wood Pavilions and Shade Structures, Landscape Planting, Automatic Irrigation System, and all items necessary to construct the Phase 1A Site Improvements, complete and in place as shown in the plans and specifications. All work shall comply with the Texas Accessibility Standards (TAS) of the Architectural Barriers Act Article 9102, Texas Civil Statutes, effective April 1, 1994 and subsequent adopted updates. This standard is prepared and administered by the Texas Department of Licensing and Regulations, Policies and Standards Division, Architectural Barriers Section, PO Box 12157, Austin, Texas 78711, 920 Colorado, Fourth Floor, Austin, Texas 78701, (512) 463-3211. https://www.civcastusa.com/project/636521d087a073e4191a3399/summary kristina.malek@kimley-horn.com
PREBID
11/14/2022 11:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT