Access the Full Project by Clicking here!
Bidjugde
JOB
Traffic Signal Route 99 Olive Avenue
BID DATE
11/18/14 - 3:00
AGENCY
Fresno
ESTIMATE
n/a
SCOPE
The scope of work includes, but is not limited to construction of curb and gutter, curb ramps, AC pavement, AC grinding and overlay, AC dike, storm drain pipe, inlets, concrete sidewalk, landscape and irrigation, signage and striping, traffic signal conduits, conductors, detector loops, controlling equipment and traffic signal pole installations to State Standards and Specifications Jean Runnels - 559-621-1163 Jean.Thomas-Runnels@Fresno.gov
PREBID
10/30/2014 10:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT