Access the Full Project by Clicking here!
Bidjugde
JOB
Martin Luther King Jr Way Vision Zero Quick Build Dwight Way Russell Street
BID DATE
11/17/22 - 2:00
AGENCY
Berkeley
ESTIMATE
$1,266,000
SCOPE
The Work generally consists of the installation of median refuge islands, hardened centerlines, solar-powered Rectangular Rapid Flashing Beacons (RRFBs), crosswalk lighting, roadway signage, detectable warning surfaces, roadway striping, pavement markings, red curb painting, pavement rehabilitation, and concrete curb ramp construction. Refer to the Plans for a detailed description of the identified locations. More specifically, the Work consists of, but is not limited to, clearing and grubbing, saw-cutting, removal and disposal of existing pavements, vertical curbs, and curb ramps; placement of Asphalt Rubber Chip seal with Type II Micro-Surfacing seal, full-depth asphalt pavement base repairs (10-inch), cold-milling asphalt pavement and hot mix asphalt overlay (4-inch), and construction of new Portland Cement concrete medians, hardened centerlines, vertical curbs, and curb ramps; Installation of detectable warning surfaces, solar-powered Rectangular Rapid Flashing Beacon assemblies (RRFBs) and crosswalk lighting, light poles, foundations, programming of signal controllers, installation of pavement striping and markings, delineators, surface-mounted channelizer posts, signage, traffic control and conforming work within the adjacent right-of-way. https://berkeleyca.gov/doing-business/working-city/bid-proposal-opportunities/martin-luther-king-jr-way-vision-zero-quick ibronswick@cityofberkeley.info

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT