Access the Full Project by Clicking here!
Bidjugde
JOB
Monroe Street Trunk Sewer
BID DATE
02/15/23 - 2:00
AGENCY
Coachella Valley Water District
ESTIMATE
$1,703,700
SCOPE
Construct an 8-inch diameter sewer pipeline along Monroe Street to connect the sewer collection system connection at the Avenue 64 subdivision to the existing 33-inch diameter CVWD sewer main at Monroe Street and Avenue 62. Provide manholes located as shown on the Drawings. The sewer pipeline will be based on gravity flow with no pump stations. https://pbsystem.planetbids.com/portal/16339/bo/bo-detail/99705 Diego Colorado 760-398-2651 Ext. 2349 Diego.Colorado@cvwd.org
UPDATES