Access the Full Project by Clicking here!
Bidjugde
JOB
T Dock Levee and Road Improvements
BID DATE
11/10/22 - 10:00
AGENCY
Freeport
ESTIMATE
n/a
SCOPE
The following are the items needed and estimated quantities: (1) The City of Freeport Project includes preparation and construction of improvements to the entry road and Levee crossing: approximately 4,70 SF a) Prep work for widening approximately 4,680 sf of roadway b) Prep work for levee transition improvement approximately 300sf c) Prep work for patch repairs to approximately 3,770sf (2) Subgrade: a) Excavation at a depth of 8” b) Proof roll c) Lime stabilization using 7% at a depth of 6” d) Grade for positive drainage e) Tack coat with SSI f) Haul off existing failed material (3) Asphalt must be: a) 2.5” Type C HMA cezell@freeport.tx.us

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT