Access the Full Project by Clicking here!
Bidjugde
JOB
Westminster Street Reconstruction
BID DATE
11/30/22 - 3:00
AGENCY
Kerrville
ESTIMATE
n/a
SCOPE
The project includes reconstruction of the existing roadway Westminster Street from Lang Drive to Main St., and Main St. to 1st street. Includes mill & overlay of Main St. Intersection: Description of major elements include: Install Stormwater Pollution Prevention Measures Install Traffic Control Measures Install Utility (Water, Sewer & Services,) improvements. Removal and Excavation of existing pavement. Subgrade prep and installation of flexible or asphalt base. Installation of concrete curb and flatwork. Adjustments of Manhole Rim and Water Valve boxes. Installation of Final Asphalt course. Installation of, Signage, Traffic Striping, and buttons. Removal of Traffic Control Measures. Site Clean Up, and Removal of Stormwater Pollution Prevention Measures. https://www.civcastusa.com/project/63629484433036b77a2106dc/summary
PREBID
11/9/2022 10:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT