Turtle Rock Zone 3 Reservoir Chloramine Booster Station
BID DATE
12/1/22 - 2:00
AGENCY
Irvine Ranch WD
ESTIMATE
$3,920,000
SCOPE
The Turtle Rock Zone 3 Reservoir Chloramine Booster Station project will construct chemical storage and dosing and reservoir mixing improvements at the existing Turtle Rock Zone 3 Reservoir and Pump Station facility located at 13 1/2 Minaret Drive in Irvine. Improvements will include: a new chloramine booster station building with a drain connection to the existing sewer in Minaret, chlorine and ammonia storage and chemical pumping equipment, three new reservoir hatches, reservoir mixing system with 3 hp Pax horizontal mixers, partial replacement of existing pump station block wall, pump station site paving improvements and a vehicle access gate, reservoir access road with steel security fence and gate, reservoir access stairway, modification of the existing SCE power feed to the pump station, electrical improvements for chloramine building and mixing system and repair and relocation of portions of the existing HOA irrigation system to accommodate the improvements. https://pbsystem.planetbids.com/portal/39499/bo/bo-detail/99452 Alex Murphy 949-453-5863 murphy@irwd.com
PREBID
11/10/2022 9:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT