Access the Full Project by Clicking here!
Bidjugde
JOB
(CMAR) 16 Inch Reach Line JMWC Reservoir
BID DATE
02/28/23 - 11:00
AGENCY
Buckeye
ESTIMATE
n/a
SCOPE
Selection 12/2022: Work shall include installing water pipe and gate valves, installing combination air and vacuum release valve, remove and replace asphalt, complete in-place site electrical, instrumentation, and controls, complete in-place the control valve assembly, connecting to the existing reservoir, site restoration and traffic control. pglasmann@buckeyeaz.gov https://www.buckeyeaz.gov/Home/Components/RFP/RFP/186/409
UPDATES