JOB
2023 TOC Flatwork Street Improvements Package 3
BID DATE
11/29/22 - 2:00
AGENCY
San Antonio
ESTIMATE
$2,000,000
SCOPE
One solicitation for a low-bid TOC for sidewalk repair, flatwork, and ramp construction in support of the IMP Sidewalks and NAMP programs. Construction of “typical” city sidewalk gap-fill projects (usually 2-3 blocks, residential, driveway approaches/sidewalks/some curb replacement/backfill and re-sod; Construction of “curb-ramps” at various locations to support the street maintenance program (separate type of work then curb ramp in a sidewalk project, typically 1-4 curb ramps per street that will subsequently get a micro-surface application. Short sidewalks/specialized construction/minor repairs; Asphalt work incidental to sidewalk job (half-lane fill that has collapsed so the curb can be installed at correct elevation, etc); street mill & overlay/reconstruction. desiree.alderete@sanantonio.gov https://www.civcastusa.com/project/6352fc962b91326732956986/summary
PREBID
11/1/2022 10:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT