Access the Full Project by Clicking here!
Bidjugde
JOB
Window Rock Wastewater Treatment Plant Phase II
BID DATE
01/13/15 - 10:00
AGENCY
NTUA
ESTIMATE
n/a
SCOPE
Separate sealed bids for the construction of the Window Rock Wastewater Treatment Plant Phase 2, which include installation of an Aero‐Mod Wastewater Treatment System, a Belt Filter Press and Facility, a UV Disinfection System, an effluent flow metering system, and completion of the site building., will be received by the NTUA Purchasing Department (Avis Jimm, Contract Administrator, (928) 729‐6243, avisj@ntua.com ), North Navajo Route 12, Fort Defiance, Arizona until 12:00 noon local time on November 19, 2014, and then at said office publicly opened and read aloud.   Engineer:  Smith Engineering Company, 2201 San Pedro NE, Building 4‐200, Albuquerque, NM 87110, (505) 884 0700, windowrockwwtp@smithengineering.pro.A Pre Bid conference followed by a site visit will be held on November 5, 2014 at 10:30 a.m. at the project site located at 1.5 miles South Lagoon Road, Window Rock, Arizona (map can be provided upon request).  Attendance at the Pre Bid Conference for this project is not mandatory to qualify to submit a Bid Proposal.

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT