Access the Full Project by Clicking here!
Bidjugde
JOB
Montezuma Mid City Pipeline Phase 2 70th Alvarado Saranac Sidewalk (REBID)
BID DATE
04/12/23 - 2:00
AGENCY
San Diego
ESTIMATE
$47,000,000
SCOPE
JR Filanc Construction - $40,922,587 WA Rasic Construction Co. - $45,745,000 Burtech Pipeline DB Pipeline - $47,143,644 TC Construction Co. - $47,617,146 Steve P Rados - $48,366,705 To install new concrete sidewalk on the west side of 70th street between Alvarado Road and Saranac Street. The work is to include installation of new 4’ and 5’ wide concrete sidewalk, curb ramp, curb and gutter, retaining walls, pedestrian push buttons, chain link fencing, bike lane striping, traffic and signing, and relocation/adjustment of pedestrian barricade and signs. MONTEZUMA PPL/MID-CITY PIPELINE PH 2: To install new water pipeline, which consists of approximately 4,880 linear feet of new 66" diameter CML & TC steel transmission main and 374 linear feet of 8-inch PVC distribution main. Work also includes associated required street ADA improvements and paving. The 66-inch transmission main will run southward from the Alvarado Water Treatment Plant (AWTP) to the intersection of 69th and Mohawk Street. The north terminus of the pipeline will be connected to existing Valve Vault No. 3 located where the Earl Thomas Reservoir Outlet Pipeline intersects the Clear Wells Interconnection Pipeline. The south terminus will connect to the Mid-City Phase 2A Pipeline just easterly of the 69th and Mohawk Street intersection. Additionally, work includes the relocation and construction of a Helix Water District 8-inch PVC distribution main running across Lake Murray Blvd and relocation of a City of La Mesa 8-inch sewer pipeline and associated manholes. Lastly, the landscaped medians along Lake Murray Blvd will be removed and rebuilt as part of this project. https://pbsystem.planetbids.com/portal/17950/bo/bo-detail/102916
UPDATES