Water Line Change Out Phase 5
BID DATE
11/3/22 - 2:00
AGENCY
Lubbock
ESTIMATE
n/a
SCOPE
Major work items are: (1) Connect to existing 12” water line on Broadway between Ave J and Texas Ave. (2) Provide and install 715 LF of new 8” C-900 DR-18 water line in alley, including reducers, shut-off gate valves and bends installed by trench or bore. (3) Connect new 8” water line to existing services and meters, including fire hydrants. (4) Repair streets, ditches and driveway approaches to prior conditions as required. (5) Connect to existing 3” water line on Avenue K south of 2nd Street. (6) Provide and install 1205 LF of new 6” and 8” C-900 DR-18 water line in street, including reducers, shut-off gate valves and bends installed by trench or bore. (7) Provide and install 106 LF of new 8” C-900 DR-18 in 16” steel encasement by bore underneath BNSF Railway. https://ci-lubbock-tx.bonfirehub.com/opportunities/77121