Access the Full Project by Clicking here!
Bidjugde
JOB
Val Vista Underdrain Improvements
BID DATE
12/7/22 - 2:00
AGENCY
Pleasanton
ESTIMATE
$1,750,000
SCOPE
The work will consist of, but is not limited to: providing and installing approximately 290 linear feet of new 8-inch fusible HDPE gravity recycled water pipe by horizontal directional drill operations, 1,220 linear feet of new 8-inch gravity recycled water pipe by open trench, 14 new manhole structures, two recycled water package pump stations with electrical and process instrumentation systems, 630 linear feet of new 2-1/2-inch PVC recycled water force mains by open trench, on- and off-site rehabilitation of approximately 580 linear feet of existing 18-inch to 48-inch CMP storm drain pipe using Cured-In-Place Pipe (CIPP) liner, and grout repair of two 21-inch CMP storm drain concrete outfalls in accordance with the Alameda County Flood Control and Water Conservation District Zone 7 encroachment permit, various related appurtenances, including traffic control, potholing operations, providing and implementing water pollution control measures, and landscape and site restoration for the Val Vista Park soccer fields underdrain system. The Cured-In-Place Pipe (CIPP) liner, and grout repair work for storm drain outfalls shall be completed by October 15, 2023. Project is located at Val Vista Community Park at the southeasterly corner of Johnson Drive and Stoneridge Drive intersection. http://www.cityofpleasantonca.gov/business/bids.asp SM Saklaen Associate Civil Engineer 925-931-5651 ssaklaen@cityofpleasantonca.gov

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT