Access the Full Project by Clicking here!
Bidjugde
JOB
Maple Canyon Restoration Phases 1 2
BID DATE
12/6/22 - 2:00
AGENCY
San Diego
ESTIMATE
$9,524,000
SCOPE
Phase 1 consists of the replacement of 16 storm drain systems throughout Bankers Hill that outfall into Maple Canyon and includes the construction of a new storm drain system within Maple St between State St and the downstream end of Maple Canyon. Storm drain sizes vary between 18", 24", 30", 36", 42", and 48". Construction also includes storm drain inlets, cleanouts, energy dissipators, trench restoration, pavement resurfacing, curb ramps, curb and gutter, revegetation, access road improvements, streambed restoration, slope repair, retaining wall, pedestrian bridge crossing, and other related work and appurtenances. Phase 2 consists of the stabilization and restoration of the canyon floor of Maple Canyon. Work includes the construction of concrete drop structures along the extent of the canyon floor, placement of rip rap at the drop structures, construction of a drainage inlet at the downstream end of the canyon, planting and temporary irrigation of the disturbed area, a pedestrian bridge crossing, and other related work and appurtenances. https://pbsystem.planetbids.com/portal/17950/bo/bo-detail/98636 Rosa Riego 619-533-3426 rriego@sandiego.gov
PREBID
11/2/2022 10:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT