8600 S 6000 W Bridge
BID DATE
12/8/22 - 4:00
AGENCY
West Jordan
ESTIMATE
n/a
SCOPE
The Work comprises: • A new three lane roadway with associated roadway elements such as curb and gutter, sidewalk, parkstrip, shoulders, and lighting that connects 5600 West to 6000 West that meet City and UDOT standards. • Two span steel bridge over MVC meeting UDOT Standards and accommodating future lane configurations. • MSE Retaining walls adjacent to the bridge abutments on the east and west side of MVC. • Raising of RMP 345kV power lines to maintain safe vertical clearances from the new roadway profile (work to be performed by Rocky Mountain Power). • Reconstruct the MVC trail to underneath the new bridge structure. • Add new storm drain system to catch new roadway flow and tie into existing systems. Joey Bryant +1 801-569-5729 Joe.bryant@westjordan.utah.gov