Access the Full Project by Clicking here!
Bidjugde
JOB
CA ERFO PLUMAS NF 23N18 Frazier Creek Bridge
BID DATE
11/1/22 - 2:00
AGENCY
Department Transportation
ESTIMATE
n/a
SCOPE
The bridge was completely damaged by fire in 2020 and will be fully replaced with a prefabricated steel bridge. The roadway approaches will be reconstructed for up to 150 feet on either end of the bridges. The bridge and a short section of the roadway approaches will be asphalt overlaid to reduce sediment from reaching the stream. Bridge rail and guardrail with terminals will be included. https://sam.gov/opp/d125a5c8a0154dae8939d5afbd56f13c/view

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT