Access the Full Project by Clicking here!
Bidjugde
JOB
Imperial Sewer Flume Sand Hill Sewer Flume Rehabilitation
BID DATE
10/25/22 - 11:00
AGENCY
El Segundo
ESTIMATE
n/a
SCOPE
In general, the flume rehabilitation will require the following: Installation of a temporary sewage bypass for the flow Removal of deteriorated concrete inside the metering structure and reshaping invert with a new fiber reinforced plastic (FRP) flume Anchor and grout in place of the new FRP flume Installation of metering equipment Remove the sewage bypass, calibrate and test the new metering equipment purchasing@elsegundo.org https://www.elsegundo.org/Home/Components/RFP/RFP/138/268895
PREBID
10/4/2022 9:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT