Access the Full Project by Clicking here!
Bidjugde
JOB
Walnut Avenue Liberty Street Intersection Improvements
BID DATE
10/11/22 - 2:00
AGENCY
Fremont
ESTIMATE
$1,508,281
SCOPE
Furnish and maintain traffic control throughout the period of construction; maintain pedestrian barricades and detour pedestrian traffic around the work area; demolish and dispose of existing improvements including asphalt pavement, curb, gutter, sidewalk, curb access ramp, medians and traffic islands; construct protected intersection improvements, modify existing traffic signals, remove right turn slip lanes, upgrade existing curb access ramp, place hot mix asphalt concrete pavement, slurry seal, install striping and pavement markings. There may be other items of work not mentioned above that are shown on the plans and required by the State Standard Specifications and/or the Special Provisions.

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT