Access the Full Project by Clicking here!
Bidjugde
JOB
2022 TOC for Miscellaneous Construction Projects Package 3
BID DATE
11/1/22 - 2:00
AGENCY
San Antonio
ESTIMATE
$8,310,320
SCOPE
Project construction may include but is not limited to: full depth reconstruction, lime/cement treatment of existing subgrade, base installation and surface course installation, pavement markings, speed hump(s), milling, concrete curbs, sidewalks, midblock crosswalks, pedestrian safety island(s), high?intensity activated crosswalk(s), driveways, concrete retaining walls?combination type, storm drain inlets/pipes, channel grading, erosion control, storm water velocity control, concrete bus pads, wheel chair ramps, removing and relocating mail boxes, topsoil, sodding, signage, striping, elevated sidewalks, sidewalk pipe railing, pedestrian beacons, traffic signal(s), pedestrian bridge installation with abutments, concrete structures, adjusting existing meter boxes, valve boxes and manholes, tree pruning, removal and/or replacement, and any other items required due to the site conditions to accomplish the project scope. https://www.civcastusa.com/project/6335a2f32b91320ca6f99f4d/summary desiree.alderete@sanantonio.gov

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT