Access the Full Project by Clicking here!
Bidjugde
JOB
Storm Drainage Improvements Erosion Control Various Locations Phase C
BID DATE
11/4/22 - 1:00
AGENCY
Dallas
ESTIMATE
n/a
SCOPE
The proposed contract includes thirteen (13) different project locations in the City of Dallas. The locations include five (5) erosion control and eight (8) storm drain improvement projects. Two of the storm drain projects also involve water main replacement. The erosion control projects include construction of gabion walls with varying heights and lengths along different creek banks. The storm drain improvement projects include installation of mains of varying diameters ranging from a 21-inch pipe to double 8’x8’ reinforced concrete boxes. Water main replacement includes installation of 8-inch and 12-inch diameter pipes. Detailed project location and information can be found in the contract specifications. https://dallascityhall.bonfirehub.com/opportunities/75549#!#opportunityMessagesSection
UPDATES