Access the Full Project by Clicking here!
Bidjugde
JOB
Concrete Repair Program CIP 2302
BID DATE
10/27/22 - 10:30
AGENCY
West Hollywood
ESTIMATE
n/a
SCOPE
The work to be done consists of furnishing all materials, equipment, tools, labor, and incidentals as required by the Plans, Specifications, and Contract Documents for the above stated project. The general items of work include removal and replacement of broken and damaged P.C.C. sidewalks, rolled curbs, curbs, gutters, residential and commercial driveways, intersection crossgutter, curb ramps on street corners to meet requirements of the ADA with truncated domes, installation of ACO Drain Trench System S100K (SK030 neutral) with the Powerlock type ADA Cast Iron Grate, removal and replacement of damaged Tree Well Adaptive Paving System into the tree wells on Santa Monica Blvd, removal and construction of 8” thick P.C.C. pavement over 6” compacted subgrade, install curb drain outlets, curb marking, and other items not mentioned that are required by the plans and specifications. https://pbsystem.planetbids.com/portal/22761/bo/bo-detail/98259 Mila Sologub (323) 848-6338 msologub@weho.org

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT