Access the Full Project by Clicking here!
Bidjugde
JOB
300 East West Temple Sewer Improvements
BID DATE
11/3/22 - 2:00
AGENCY
South Salt Lake
ESTIMATE
n/a
SCOPE
The Work generally includes, but is not limited to, the following: 300 East Sewer Improvements: The installation of approximately 4,489-feet of new 12-inch PVC sewer pipeline with manholes along 300 East; Haven Avenue to Leslie Avenue, Leslie Avenue; 300 East to State Street, and State Street; Leslie Avenue To 2700 South. The total length of pipe includes replacing existing 8 and 10-inch sewers, by-pass pumping, surface restoration, reconnection of service laterals, coordination with UDOT, and incidental work to provide a functioning sewer system. West Temple Sewer Improvements: The installation of approximately 1,848-feet of new 30-inch GFRP sewer pipeline with manholes along West Temple Street; 2400 South to Utopia Avenue. The total length of pipe includes replacing existing 18 sewers, by-pass pumping, surface restoration, reconnection of service laterals, coordination with UTA, installing 75-feet of 30-inch pipe with 40-inch new steel casing jack and bored under UTA tracks, and incidental work to provide a functioning sewer system. Also, the rehabilitation of 1,951-feet of 15-inch VCP and 188-feet of 18-inch VCP sewer trunk line from 2700 South to 2400 South utilizing CIPP and open cut construction of point repairs including the reinstatement of service laterals. Ariel Andrus aandrus@sslc.gov cmerket@sslc.gov
PREBID
10/7/2022 9:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT