Access the Full Project by Clicking here!
Bidjugde
JOB
SR 138 Avenue J Interchange Improvements Phase II Caltrans Interchange
BID DATE
10/18/22 - 11:00
AGENCY
Lancaster
ESTIMATE
$30,500,000
SCOPE
The Scope of the Work includes, but is not limited to: • Earthwork • Clearing, Grubbing, Demolition, and Removals • Cold Planing • Roadway and Structure Excavation • Dig-out Reconstruction • Aggregate Base and Lean Concrete Base • AC (AC – HMA, RHMA, & ARHM) Pavement Overlay • Chain Link Fence • Guardrail System • PCC Structures (Retaining Walls) • PCC Bus Pads, Curb, Gutter, Median, Sidewalks, Handicap Ramps, and Cross Gutters • Light Weight Concrete Structural Concrete • Structural Concrete Backfill • Temporary Water Pollution Control • Permanent Erosion Control • Drainage System • Adjust Manhole Frame and Cover • Dry Utilities Coordination • Temporary Traffic Control • Traffic Signing, Striping, and Markings • Landscape and Irrigation • Electrical (Traffic Signal, Street Lighting, Ramp Metering, Interconnect) https://pbsystem.planetbids.com/portal/42566/bo/bo-detail/93735 Mike Livingston / 661-723-6227 mlivingston@cityoflancasterca.org
PREBID
9/27/2022 9:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT