Access the Full Project by Clicking here!
Bidjugde
JOB
SR99 Corridor Bikeway Facility Bikeway 99 Phase 5 20th St Bicycle Pedestrian Overcrossing
BID DATE
12/1/22 - 5:00
AGENCY
Chico
ESTIMATE
$10,700,000
SCOPE
The Project will construct a 0.44-mile Class I bicycle and pedestrian facility adjacent to the eastside of State Route 99 (SR99), including a steel bridge overcrossing at East 20th Street and SR99. The work to be done under this contract will generally consist of steel bridge fabrication and erection, approach structures, clearing and grubbing, construction surveying, grading, structural excavation, block wall construction, aggregate base, asphalt paving, concrete paving, lighting, traffic signal modifications, fencing, landscaping, striping and markings, roadway signs, and all other work as shown on the contract plans. Noel Carvalho (530) 879-6900 noel.carvalho@chicoca.gov
UPDATES