Second Lower Feeder PCCP Rehabilitation Reach 3B
BID DATE
12/8/22 - 2:00
AGENCY
Metropolitan WD
ESTIMATE
$72,000,000
SCOPE
The work consists of rehabilitation of approximately 19,000 linear feet of prestressed concrete cylinder pipe (PCCP) including excavating access portals and removing portions of existing PCCP, installing Metropolitan-furnished and Contractor-furnished steel liner pipe, expanding and welding the steel liner pipe, grouting the annular space, cement mortar lining, and modifying pipeline appurtenant structures, rehabilitating three existing isolation valve structures, rehabilitating two service connections, installing and removing Palos Verdes Reservoir temporary bypass lines, disinfecting pipeline, controlling traffic, abating hazardous materials, and other appurtenant work as specified and shown on the drawings. https://pbsystem.planetbids.com/portal/16151/bo/bo-detail/98132 SpecsDesk SpecsDesk@mwdh2o.com