Access the Full Project by Clicking here!
Bidjugde
JOB
2022 Bond Year 1 – Contract 5
BID DATE
09/29/22 - 1:30
AGENCY
Fort Worth
ESTIMATE
n/a
SCOPE
The major work will consist of the (approximate) following: Constructing new water and sanitary sewer mains and paving. Unit 1: Water Improvements 5623 LF – 8” PVC Water Pipe 6918 LF – Temporary Asphalt Paving Repair 81 EA – 1” Water Service 26 EA – 8” Gate Valve Unit 2: Sanitary Sewer Improvements 3 EA – 4’ Manhole 200 LF – 8” Sewer Pipe 8 EA – Manhole Adjustment, Major w/ Cover Unit 3: Paving Improvements 31660 SF – 4” Concrete Sidewalk 9643 SF – 6” Concrete Driveway 15040 SY – 6” Conc Pvmt 16125 SY – 8” Lime Treatment 500 SY – Pavement Pulverization (11”) 610 SY – 3” Asphalt Pvmt Type D Unit 3: Paving Improvements Alternate A (POL) 13215 SY – 3” Asphalt Pvmt Type D 10128 LF – 6” Conc Curb and Gutter 13955 SY – Pavement Pulverization (11”) Unit 4: Stormwater Improvements 143 LF – 21” RCP, Class III https://www.fortworthtexas.gov/departments/finance/purchasing/bids/manual-bids/tranp/2022/102931-2022-bond-year-1-contract-5 Gregory.Robbins@fortworthtexas.gov

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT