Access the Full Project by Clicking here!
Bidjugde
JOB
Sanitary Sewer Rehab 100 N 700 N Sumac Dr 1200 E 1100 N
BID DATE
10/18/22 - 2:30
AGENCY
Logan
ESTIMATE
n/a
SCOPE
The City is preparing to mitigate a structurally failing concrete sewer main on 100 North from 150 East to 200 East, 700 North from 600 East to 700 East, 1200 East from 920 North to 1100 North, and 1100 North from 1200 East to 1600 East. Mitigation of these concrete sewer mains is to include the installation of Rigid PVC Fold and Form Pipe Liner. Additionally, sections of the 100 North and 700 North sewer mains are to be repaired and an outside drop manhole reattached to the existing sewer main joseph.hawkes@loganutah.org kamilla.schultz@loganutah.org

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT