Access the Full Project by Clicking here!
Bidjugde
JOB
SR 179 Pedestrian Crossing Oak Creek SIM 4C (REBID)
BID DATE
03/23/23 - 2:30
AGENCY
Sedona
ESTIMATE
$6,000,000
SCOPE
ORG: Standard Construction Co. Inc. - $6,611,303 The project involves the construction of a 10-12 foot concrete shared use pathway under the existing SR 179 Oak Creek bridge, with ramps running parallel to SR 179 on each side of the roadway. bwelch@sedonaaz.gov The proposed improvements will include: 640’+/- of concrete pathway passing under the Oak Creek Bridge connecting both the north and south sidewalks of SR 179. Construction of approximately 3,200 square feet of reinforced concrete retaining wall. Channel excavation and bank stabilization. Decorative landscaping/hardscape improvements. Installation of pavement marking and signing related to the pathway. Pedestrian channelization and signage along SR 179 around the crossing. Pedestrian wayfinding signage and pavement marking. Protection and preservation of existing tree vegetation. BWelch@sedonaaz.gov
UPDATES