Access the Full Project by Clicking here!
Bidjugde
JOB
State Street Sidewalk Improvements
BID DATE
10/24/22 - 3:00
AGENCY
Hemet
ESTIMATE
$246,500
SCOPE
The work generally consists of construction of ADA accessible sidewalks and PCC driveway approaches in areas where those facilities do not currently exist and/or replacement of said facilities where the existing condition is not compliant with current ADA standards. It shall be the Contractor’s responsibility to investigate each area and determine the extent of work, specific to each location, necessary to ensure all new concrete is in full conformance with current ADA standards and all other relevant standards, codes, and ordinances. The work also includes any grading, compacting, removal, replacement, relocations of any existing items necessary to complete the work including, but not limited to, sign relocation, concrete/asphalt removal and replacement, tree removal and replacement, grading, traffic control, and all other necessary items. https://pbsystem.planetbids.com/portal/39477/bo/bo-detail/98327 Candace Sunds 951-765-2348 csunds@hemetca.gov

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT