Access the Full Project by Clicking here!
Bidjugde
JOB
West Long Street Reconstruction
BID DATE
09/27/22 - 10:00
AGENCY
Stephenville
ESTIMATE
n/a
SCOPE
Work to be performed generally includes reconstruction of West Long Street from Alexander Road to Graham Avenue. The existing 2-lane undivided urban section will be reconstructed with curb, gutter and sidewalks on both sides of the road. Paving and sidewalk improvements will be contained within the right-of-way. Existing water and wastewater mains and service lines, 9’x5.5’ culvert crossing, and related appurtenances will be replaced. Quantities include approximately: 2,800 SY Brick Paving; 6,400 SY 3.5” HMAC or 7” Concrete Paving; 3,000 LF 4” Concrete Sidewalk with and without Integrated Retaining Walls; 3,500 LF 6”-8” PVC Waterline; and 3,400 LF 6”-12” PVC Sanitary Sewer. https://www.stephenvilletx.gov/publicworks/page/west-long-street-reconstruction-project jsj@freese.com https://www.civcastusa.com/project/630f4094eeabec5fad864a34/summary
PREBID
9/20/2022 10:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT