Miles Lane Sewer Pump Station Rehabilitation
BID DATE
10/6/22 - 2:00
AGENCY
Watsonville
ESTIMATE
$1,255,000
SCOPE
The Work generally consists of replacing the existing sanitary sewer lift station with a new lift station. The major elements of the Work include: a new sanitary sewer pump station with wet well, valve vault, two 3 HP pumps, controls and associated piping; 35 LF of 4-inch PVC force main, 35 LF of 8-inch PVC gravity sewer and one new sanitary sewer manhole; new emergency generator; rehabilitate 355-LF of existing 6-inch sewer main by relining with cured-in-place pipe. Additive bid alternate item: Provide 820-LF of 2-inch conduit in Miles Lane from the pump station to the north side of Freedom Blvd. danielle.green@cityofwatsonville.org https://www.ebidboard.com/public/projects/showproject.asp?mbrguid={D47D797E-82F1-4059-8E89-C5A001200847}&projectguid={E690F92E-2FA2-4DCD-BD16-7B8575FF5176}