Access the Full Project by Clicking here!
Bidjugde
JOB
Cip Priority 2 Street Improvement (Phase 2A) Fy 2022 2023
BID DATE
09/22/22 - 10:00
AGENCY
Diamond Bar
ESTIMATE
$1,200,000
SCOPE
The project consists of mobilization, traffic control, removal and construction of concrete sidewalks, curb and gutters, driveways approaches, curb ramps, cross gutter, removal of existing asphalt, base and subbase, cold mill 2” existing AC pavement, install 6” crushed aggregate base, AC leveling course and asphalt overlay, install speed bump, prune tree roots and install root barriers, adjust existing water valve can and cover to finished grade, adjust existing storm drain/ sewer/ utility manhole frames and covers to finished grade, traffic detector loops and traffic striping. Mir T. Fattahi,310-603-020 X 835,mfattahi@lynwood.ca.us https://pbsystem.planetbids.com/portal/39486/bo/bo-detail/97515#bidInformation
UPDATES