Beechwood Water Supply Corporation Water System Improvements
BID DATE
10/12/22 - 2:00
AGENCY
Wylie
ESTIMATE
$107,000
SCOPE
SCOPE OF WORK For the Beechwood Water Supply Corporation Water System Improvements TWDB DWSRF No. 62801 GENERAL It is the intent and purpose of these contract documents to provide for improvements to the existing water system. CONTRACTOR TO PERFORM ALL WORK AS INDICATED. This project will be funded by TWDB. This contract shall provide for the necessary labor, equipment, tools, materials, and all other related construction for the proposed project. SUMMARY OF WORK Water Plant Demolish existing 33,000 gallon (x 2) tanks and foundation including all labor, equipment, and disposal. Construct a new 66,000 gallon AWWA Bolted Ground Storage Tank, including foundation, labor and materials, excavation, backfill, and site grading. Remove and replace existing tank control fill valve, and isolation valves, including all fittings, valves, labor and materials. Furnish and install yard piping modifications for proposed tank fill and suction lines including valves, connections to new tank, connections to existing piping, excavation, backfill and compaction. Furnish all site work including all site grading, seeding, new chain-link fence, and site cleanup. Ridgewood Waterline Construct approximately 160 linear feet of 2” DR-21 Class 200 PVC water line by open cut outside of pavement including all fittings, thrust blocking, tracer wire, pressure testing, disinfection, bacteriological testing, excavation, connection to existing water lines, flush valves, gate valves, backfill, embedment, surface restoration, and other appurtenances as shown on the contract plans and specifications. Furnish and install air release/vacuum valves as required, restrained joints, valves, fittings, manholes, vents, and all related appurtenances including excavation, backfill as shown on the contract plans and specifications. Install road bore including steel casing under County Road including all fittings, bore pits, backfill, embedment, surface restoration, and other appurtenances as shown on the contract plans and specifications Special Considerations Contractor to coordinate with WSC prior to making connections to existing waterlines, and coordinate at least 72 hours in advance for any shutdowns required for tie-ins. Contractor to coordinate with WSC for actuation of all existing waterline valves. Underground utilities exist near or within the project area. During construction the Contractor shall take the necessary precautions to avoid damaging the existing utilities within the limits of the project site The Contractor shall pay close attention to the project schedule to ensure that the work is completed in a timely manner without delays. Contractor shall restore the construction sites to their original condition or better prior to the project completion and Owner’s acceptance. Contractor to comply with all environmental requirements as included in the plans and specifications. https://www.civcastusa.com/project/630666d8948510254ce24d63/summary sjordan@spi-eng.com
UPDATES