Access the Full Project by Clicking here!
Bidjugde
JOB
Atpsb1l 5441(076) Juan Bautista De Anza Multi Use Improvement Trail Phase 4
BID DATE
10/20/22 - 2:00
AGENCY
Moreno Valley
ESTIMATE
n/a
SCOPE
The City of Moreno Valley proposes to improve the existing concrete walkway on the Juan Bautista De Anza Multi Use Trail from Moreno Valley Mall to Iris Avenue by constructing a multiuse concrete trail for bicyclists and pedestrians. The proposed trail will consist of a ten (10) to fourteen (14)-foot-wide Portland cement concrete (PCC) bike path adjacent to a four (4)-footwide decomposed granite path along the Santa Ana Pipeline (SAPL). The proposed work includes, but is not limited to, the construction of AC or PCC multi-use trail; grading; excavation of earth and rock; excavation of PCC and AC; placement and compaction of fill materials and native soil; alley driveway, curb; curb and gutter; sidewalk; curb ramps; asphalt concrete paving over base; PCC pavement over base; PCC underdrain; retaining wall; handrail; drainage; pavement markings and traffic striping and markings; signage; bollards; traffic control; and landscape restoration. The project also includes high visibility crosswalks, traffic signal modification at the major street crossing, signage, and striping along the trail alignment. 951-413-3130,techinfo-capproj@moval.org https://pbsystem.planetbids.com/portal/24660/bo/bo-detail/97812#bidInformation

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT