Access the Full Project by Clicking here!
Bidjugde
JOB
Slurry Seal Group 2223
BID DATE
10/13/22 - 2:00
AGENCY
San Diego
ESTIMATE
$5,440,000
SCOPE
The work includes: placement of rubber polymer modified slurry (RPMS), crack sealing, removal of humps & pavement irregularities, asphalt mill and pave, and dig-outs, pavement base repairs, milling and disposal of pavement fabric, development of a QA/QC plan that includes inspection and testing for asphalt and slurry work, replacing traffic signal detection loops and stub outs, adjusting existing City manhole frames and covers to grade, raising appurtenances to grade (water, sewer), raising survey monuments to grade, reconstructing survey monument boxes, street and sidewalk sweeping, removal and replacement of existing thermoplastic striping and markings/legends, implementation of new striping plans, traffic control drawings & permits, weed abatement, storm drain inlet protection, installation of inlet markings, sediment control, and possible night and weekend work. All work would occur within the public right-of-way (paved streets) or previously disturbed non-sensitive areas only, and outside of the City's Multiple Habitat Planning Area (MHPA). No sensitive vegetation would be impacted or removed. Storm Water Best Management Practices (BMPs) for erosion control preventing discharge, as well as Traffic Control Plan (TCP) would be implemented throughout construction. Brittany Friedenreich,619-533-3104,bfriedenreic@sandiego.gov https://pbsystem.planetbids.com/portal/17950/bo/bo-detail/97778#bidInformation

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT