Access the Full Project by Clicking here!
Bidjugde
JOB
Construction of Foothill Boulevard Bridge across Wyman Ravine
BID DATE
11/13/14 - 11:00
AGENCY
Butte County
ESTIMATE
n/a
SCOPE
The proposed project involves, in general, constructing a 29’- 8” long, three span, cast-in-place triple box culvert bridge, having an overall width of 58 feet together with removal of an existing reinforced concrete bridge and reconstructing approximately 800 lineal feet of roadway. The new structure will provide for 48 feet of clear roadway width, concrete barrier rails on both sides, and five-foot wide concrete sidewalks. The reconstructed roadway approaches include 12-foot wide through lanes, a 14-foot wide northbound left turn pocket and 5-foot wide paved shoulders. Felicia McDowell 538-7681 ext 2018 fmcdowell@buttecounty.net

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT