Access the Full Project by Clicking here!
Bidjugde
JOB
Kerrville Kerr County Joint Airport Board Runway 3 21 Resurface
BID DATE
09/27/22 - 10:00
AGENCY
Kerrville
ESTIMATE
n/a
SCOPE
The project consists of the milling of the existing city airport asphalt runway and removal of all milling material from the runway to an on-site location. The runway work area is approximately 2400 LF long by 60 feet wide. The Kerrville Kerr County Airport will retain the materials and will be responsible from hauling from the site. The milling is to be to a depth of (2) two inches. Barricades are not anticipated but if an end barricade is required it will be at no separate payment. The Contractor shall protect all existing electrical and utilities. Alternate I may or may not be included at the discretion of the Kerrville Kerr County Airport Board. This alternate would potentially include placement of Type D asphalt material with a lay down machine. https://www.civcastusa.com/project/630e66f3433036789fd37899/summary 6seng@6s-engineering.com
PREBID
9/13/2022 10:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT