Access the Full Project by Clicking here!
Bidjugde
JOB
AZ FTBR SALT 80 Horse Mesa Bridge
BID DATE
10/25/22 - 2:00
AGENCY
Department Transportation
ESTIMATE
$2,000,000
SCOPE
This project proposes to construct a new prefabricated bridge adjacent to the existing Horse Mesa bridge structure within the Tonto National Forest on Forest Route FR 80 (MP 3.90) over the Upper Car Wash area. The existing bridge is located under a rock outcropping that creates a vertical clearance issues and drainage concerns during rain events. The existing bridge will remain in place for use in emergency situations. The existing unpaved roadway will be realigned to provide connection with the new bridge. https://sam.gov/opp/3d7f381f49084363b160d81c314924b6/view
UPDATES