Access the Full Project by Clicking here!
Bidjugde
JOB
Waller Creek Delta Construction
BID DATE
11/17/22 - 2:00
AGENCY
Austin
ESTIMATE
$54,925,000
SCOPE
The Creek Delta project is a component of the Creek Delta Link phase of the Waller Creek District - Waterloo Greenway program. The project requires SITES sustainability documentation to achieve minimum silver certification. The trail will be located on both banks of Waller Creek from Lady Bird Lake to 4th St. and will be approximately 1 mile in total length. There will be top of bank trails, creek level elevated walkways, 4 new pedestrian bridges, a biofiltration pond, Austin Energy electric distribution duct bank and other utility work. Multiple new trail connections to adjacent ROWs are proposed. The creek will be reconstructed, including walls and slope stabilization features to repair the severely eroded slopes. Enhanced planting and ecological creek features will be installed to restore the riparian zone and ecosystem. COA to own and manage construction contract. diana.wang@austintexas.gov
UPDATES