S 7th Avenue E Hull Street E Murray Street W Johnson Street E Bullock Street Paving
BID DATE
09/8/22 - 2:00
AGENCY
Denison
ESTIMATE
$4,024,000
SCOPE
The S. 7th Avenue, E. Hull Street, E. Murray Street, and W. Johnson Street projects involve the construction of approximately 4,170 linear feet of 8-inch diameter PVC water line, and 250 linear feet of 6-inch diameter PVC waterline. The project also includes replacing approximately 3,075 linear feet of 6- inch diameter sanitary sewer line; reconstruction of approximately 1,600 linear feet of 29-feet wide asphalt road with concrete curb & gutter; reconstruction of 650 linear feet of 18-feet wide asphalt road; reconstruction of approximately 500 linear feet of 27-feet wide asphalt road with concrete curb & gutter; reconstruction of 1,230 linear feet of 31-foot-wide asphalt roadway. The E. Bullock Street project involves the construction of approximately 515 linear feet of 8-inch diameter PVC waterline and 68 linear feet of 6-inch diameter PVC waterline. The project also includes the construction of 538 linear feet of 8-inch diameter sanitary sewer line; reconstruction of 506 linear feet of 31-foot-wide asphalt road with concrete curb & gutter. https://www.civcastusa.com/project/630381cd7cd6dc5747cc75f2/summary

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT