Access the Full Project by Clicking here!
Bidjugde
JOB
Beechwood Water Supply Corporation Sanitary System Improvements
BID DATE
10/12/22 - 2:30
AGENCY
Wylie
ESTIMATE
$200,000
SCOPE
SCOPE OF WORK For the Beechwood Water Supply Corporation Sanitary Sewer System Improvements TWDB CWSRF No. 73803 GENERAL It is the intent and purpose of these contract documents to provide for improvements to the existing waste water system. CONTRACTOR TO PERFORM ALL WORK AS INDICATED. This project will be funded by TWDB. This contract shall provide for the necessary labor, equipment, tools, materials, and all other related construction for the proposed project. SUMMARY OF WORK Base Bid 1. Remove existing solids accumulated in the existing concrete WWTP basins by wet haul, including all labor, materials, hauling, and disposal costs. 2. Modify existing WWTP Tanks for proposed Flow Equalization Storage, including all piping, airlift pump, diffusers, labor and materials. 3. Remove and replace existing bar screen structure, including all fittings, piping, labor and materials. 4. Furnish and install new onsite package lift station, including all labor and materials, pump basin, pumps, piping, valves, fittings, excavation, backfill, compaction, electrical and connections to existing piping. 5. Furnish all site work including all site grading, seeding, and site cleanup. Additive Alternates 6. Furnish and Install handrails on the existing WWTP Units. 7. Remove existing solids accumulated in the existing off-site lift station basins (6 locations) by wet haul, including all labor, materials, hauling, and disposal costs. 8. Remove and replace existing 10’ x 10’ concrete slab for lift station D. 9. Remove and replace existing concrete covering annular space between boxes and replace with fiberglass grating. Special Considerations 1. Contractor to coordinate with WSC prior to making connections to existing sewer lines, and coordinate at least 72 hours in advance for any shutdowns required for tie-ins. Contractor to coordinate with WSC for actuation of all existing waterline valves. 2. Underground utilities exist near or within the project area. During construction the Contractor shall take the necessary precautions to avoid damaging the existing utilities within the limits of the project site 3. The Contractor shall pay close attention to the project schedule to ensure that the work is completed in a timely manner without delays. 4. Contractor shall restore the construction sites to their original condition or better prior to the project completion and Owner’s acceptance. 5. Contractor to comply with all environmental requirements as included in the plans and specifications. https://www.civcastusa.com/project/63077383948510254ce24d64/summary sjordan@spi-eng.com
UPDATES