Pine Flat Street Water Main Replacement
BID DATE
09/29/22 - 2:00
AGENCY
Shasta Lake
ESTIMATE
$78,315
SCOPE
Work tasks on this project generally include traffic control, erosion and sediment control, trench sheeting, shoring, and bracing, temporary water service connections, partial removal of existing 2” water main, installation of new 6” water main, installation of one valve assembly, removal of one 2” valve, and surface restoration. All other items or details not mentioned above that are required by the Plans or the Contract Documents shall be furnished, fabricated, constructed, or installed. The Engineer’s Estimate for this work is $78,315. wbond@cityofshastalake.org http://cityofshastalake.org/bids.aspx?bidID=44