Access the Full Project by Clicking here!
Bidjugde
JOB
(CMAR) EPCOR Water Line Interconnect Dean McDowell
BID DATE
09/8/22 - 8:00
AGENCY
Buckeye
ESTIMATE
n/a
SCOPE
AWARD 10/21/22: Generally, this (Project) involves designing and installing a 12-inch water line, meter, and Pressure release valve (PVR) connected to the EPCOR water distribution system at McDowell Road, near the Dean Road alignment, north of 1-10, near the western boundary of the Verrado development. Also included, as part of this project are any improvements or modifications to the City’s existing water system to accommodate the combing of the two water supplies. dfasano@buckeyeaz.gov https://www.buckeyeaz.gov/Home/Components/RFP/RFP/174/409
UPDATES