JOB
Washington Road Bridge Railing Repair
BID DATE
09/14/22 - 3:00
AGENCY
Turlock
ESTIMATE
$138,000
SCOPE
The work consists, in general of: removal of existing damaged northbound bridge railing, repair of damaged concrete decking and installation of anchor plates, posts, railing, and traffic energy dissipator end treatment. Additional improvements include removal of existing asphaltic concrete and replacement with new asphaltic concrete and striping and other associated work shown on the contract plans. The work includes all necessary labor, materials, tools, equipment and any incidentals needed to perform the improvements as shown on the contract plans. fpezeshk@turlock.ca.us engineering@turlock.ca.us

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT